Data quality before an S/4HANA migration: where to start

Migration timelines slip when master data is not ready. A short, ordered approach keeps data work on the critical path.

Key takeaways

  • Name a data owner for each master data object before cleansing starts.
  • Profile the data first: count duplicates, gaps and obsolete records.
  • Cleanse in the source system where possible, and load only what is needed.
  • Run at least two full trial loads and reconcile the results with the business.

Why data decides the timeline

In most migration programmes the technical load is short. The delay comes from data that is incomplete, duplicated or owned by nobody. Finding this late forces rework in the final weeks before cutover.

Start with ownership

Name a business owner for each master data object, such as customers, vendors, materials and cost centres. The owner signs off the rules for what a complete record looks like. Without this, cleansing becomes a technical task with no agreed standard.

Profile before you cleanse

Measure the current state first: the number of duplicate records, missing mandatory fields, and records not used in the last two years. These figures set the size of the work and show which objects need attention first.

Cleanse at the source, load only what is needed

Fixing records in the legacy system is usually cheaper than fixing them after extraction. Decide which historical data must move, and archive the rest. Moving less data shortens every trial load.

Use trial loads as the test

Run at least two full trial loads. After each one, reconcile record counts and key balances with the business, and log every rejected record with its cause. The rejection log is the best guide to what remains to fix.